At Wrap4Car, we use premium materials for every project. Choose from a variety of finishes and styles to create a beautiful, long-lasting look for your vehicle.
With decades of expertise serving Boston and surrounding areas, Wrap4Car delivers skilled vehicle wrapping services with precision and care.
Your happiness is our ultimate standard. We treat every vehicle transformation with the utmost care and dedication, ensuring a flawless finish and a worry-free experience because your vision is our top priority.
Paragon
Moisture behind failing siding spreads damage to the wall assembly. By the time you notice issues inside, the exterior has suffered for seasons.
Replacing siding improves energy efficiency. New cladding systems add insulation, reducing heat loss during the cold, wet winters here — a smart choice while the exterior is being updated.
We’re eager to chat! Drop us a line for all your exterior needs.
Visit Us
Call Us
Email Us
Working Hours
Let us know how we can assist you! Fill out the form, and we’ll respond within 24 hours.
| Mission Siding Replacement Material Specification | Standard Wood Strapping Rainscreen Price | Continuous Exterior Insulation Price | Full Weather Barrier Replacement Price |
|---|---|---|---|
| Vinyl Siding | CAD 9,000 – CAD 14,000 | CAD 12,000 – CAD 18,000 | CAD 9,000 – CAD 14,000 |
| Board and Batten Siding | CAD 13,000 – CAD 22,000 | CAD 17,000 – CAD 27,000 | CAD 13,000 – CAD 22,000 |
| Fiber Cement Lap Siding | CAD 12,000 – CAD 25,000 | CAD 16,000 – CAD 30,000 | CAD 12,000 – CAD 25,000 |
| Natural Cedar Bevel Siding | CAD 14,000 – CAD 26,000 | CAD 18,000 – CAD 32,000 | CAD 14,000 – CAD 26,000 |
Durable Siding Solutions
Moisture can get behind old siding, causing boards to warp, sheathing to rot, and mold to grow. These problems won’t fix themselves. Replacing your siding with a strong system stops this cycle. It seals your home against Mission’s steady rainfall.
Our team takes off every damaged layer and installs new siding along with a rain screen assembly that lets moisture escape. This creates a drier, more energy-efficient home that looks great from the curb and stays strong for years. For homeowners in Vancouver, siding replacement in Vancouver means using materials and methods that work well in our wet climate.
Mission is in the Fraser Valley, where rain and humidity challenge every exterior surface. Older homes often have original wood or hardboard siding that absorbs moisture. This leads to swelling, peeling paint, and hidden decay.
Modern fibre cement and engineered siding options resist that constant wetness while looking like traditional wood. A proper installation with a rain screen behind the siding allows any moisture that gets in to drain away, instead of sitting against the structure. That’s why Mission homeowners pick siding made for the local climate.
Siding installation techniques
Replacing siding in Mission starts with removing old cladding. This lets us check the sheathing for hidden rot or water damage. We repair any damaged areas before attaching vertical furring strips over a weather-resistant barrier. These strips help create a drainage plane and a ventilated space behind the new siding.
Fibre cement and high-quality engineered wood are the best choices here. They resist swelling, wicking, and fungal growth in wet conditions. Each board is secured with corrosion-resistant fasteners. We also leave proper gaps at windows, door trim, and horizontal trim lines so water can escape. The top and bottom of the rain-screen cavity are left open to let air circulate and dry out any moisture quickly after a storm.
Mission’s wet, humid winters need a wall system that can handle wind-driven rain without trapping moisture. The rain-screen principle keeps the cladding separate from the water-resistive barrier with an air gap. This gap helps balance air pressure across the siding, reducing the force that pushes water through joints during storms.
If water gets past the siding, it hits the drainage plane and flows down to weep holes at the bottom of the cavity. Capillary breaks at the furring strips stop moisture from wicking into the sheathing. Integrated flashing at openings directs water back out. This drainage and drying system keeps the structural framing safe during Mission’s frequent wet weather.