Menu
Our Services
Outdoor Living
Roofline & Water
Walls & Envelope
At Wrap4Car, we use premium materials for every project. Choose from a variety of finishes and styles to create a beautiful, long-lasting look for your vehicle.
With decades of expertise serving Boston and surrounding areas, Wrap4Car delivers skilled vehicle wrapping services with precision and care.
Your happiness is our ultimate standard. We treat every vehicle transformation with the utmost care and dedication, ensuring a flawless finish and a worry-free experience because your vision is our top priority.
Paragon
When cedar siding shows signs of rot, the problem often runs deeper than what’s visible. Moisture can seep behind the shakes, threatening the sheathing and framing. Left unchecked, small spots become costly structural repairs.
Homeowners in this area often upgrade their exteriors with a fresh cedar finish that withstands the rainy climate. Proper installation improves insulation, keeping homes warmer through damp winters. This is an opportunity to enhance curb appeal while increasing resilience.
We’re eager to chat! Drop us a line for all your exterior needs.
Visit Us
Call Us
Email Us
Working Hours
Let us know how we can assist you! Fill out the form, and we’ll respond within 24 hours.
| Westwood Plateau Cedar Siding Profile and Grade | Economy Exterior Remodeling Prices | Mid-Range Exterior Remodeling Prices | Premium Exterior Remodeling Prices |
|---|---|---|---|
| Board and Batten Siding | CAD 14 – CAD 22 | CAD 16 – CAD 24 | CAD 18 – CAD 30 |
| Clear-Grade Cedar Siding | CAD 14 – CAD 22 | CAD 16 – CAD 24 | CAD 18 – CAD 30 |
| Clear Grade Siding | CAD 14 – CAD 22 | CAD 16 – CAD 24 | CAD 18 – CAD 30 |
| STK (Select Tight Knot) | CAD 14 – CAD 22 | CAD 16 – CAD 24 | CAD 18 – CAD 30 |
| Yellow Cedar Siding | CAD 16 – CAD 24 | CAD 18 – CAD 26 | CAD 20 – CAD 30 |
Moisture-Resistant Installation
That lingering mossy smell shows moisture trapped behind old shakes. Replacing them with fresh cedar siding stops water from getting in and rotting the wood underneath. Our crews remove the old layer, check what’s behind it, and prepare the surface so the new cedar keeps out rain for decades.
The real fix happens at the substrate. We put on a breathable weather barrier and treat the back of every new shake to stop cupping and splitting. You get a straight, tight exterior that sheds water naturally and keeps fungi from coming back. It’s the same method we use for cedar siding in Vancouver, just adjusted for the exposure your lot faces.
Homes in Westwood Plateau catch every weather system that comes through the Tri-Cities. The elevation and thick tree canopy keep exterior walls damp longer. This can turn small shake cracks into full replacements faster than in drier areas of Coquitlam.
Many homes here still have their original 1990s cedar, often with poor flashing at the eaves and butt joints. Wind-driven rain pushes moisture sideways into those gaps. Our installations add stepped flashing and wider overhangs where needed, giving the siding a better chance against the storms that hit this neighborhood first.
Grain Orientation and Fastening
We use vertical-grain heartwood for cedar siding in Westwood Plateau. This type absorbs less moisture than flat-grain cuts. It reduces the expansion and contraction that can open joints in shaded areas. We secure the boards with stainless steel ring-shank nails. These nails are driven into the thickest part of the shake to prevent splitting from wind-rock on exposed ridges. We place fasteners in a two-nail pattern per shake, offset from the edges. This allows the wood to move slightly without pulling free or buckling.
Back-priming is an important step. We apply an alkyd-oil primer to all six sides before installation. This seals the end-grain to stop water from being drawn upward from damp trim boards. We leave a small gap in the butt joints between shakes. This gap allows the wood to swell without crushing itself during the wet winter months when fog lingers on the plateau.
A cedar exterior in Westwood Plateau works well only if the wall can dry out after each rain. We create a capillary break behind the siding by installing a drainage mat over the weather-resistant barrier. This allows water to flow down to the weeps at the bottom of the wall. Without this air gap, moisture trapped between the shake and the sheathing can lead to fungi growth in the area’s high humidity.
The flashing design treats every horizontal transition as a potential leak point. Wind can drive rain upward. We use head flashing over windows and doors that extends half an inch past the trim on each side. This includes a drip edge that directs water away from the siding below. At the foundation, a metal starter strip angles the first course of shakes outward. This prevents wicking that can rot the bottom edges of homes where snow accumulates against the wall.
Cedar Siding Regulations
For cedar siding on a Westwood Plateau home, Coquitlam’s noise rules allow construction noise only from Monday to Friday between 7:00 a.m. and 8:00 p.m. and on Saturday from 9:00 a.m. to 6:00 p.m. Contractor work that creates noise is not allowed on Sundays or holidays unless a noise exemption is obtained. Homeowners doing their own work may continue on Sundays and holidays from 9:00 a.m. to 6:00 p.m.
Replacing exterior cladding with cedar siding may require a Development Permit from the City of Coquitlam, especially in designated development permit areas. This permit reviews the proposed design, materials, and colors before work starts. It is more common in multi-family or planned developments on Westwood Plateau.
We worked on a local school in Westwood Plateau where the cedar siding on several buildings had split. This damage let moisture get behind the boards, which could harm the structure. We planned the re-siding around their daily schedule and worked with site staff to ensure students and teachers could move safely without disruption. We replaced the damaged cedar board by board and sealed the joints and flashing to keep water out. By the end of the project, the buildings looked uniform again, and staff no longer worried about moisture harming their exterior walls.
Local Access and Community
Cedar siding in Westwood Plateau is a regular part of our work in Metro Vancouver, not a special trip. We drive up Water Street and Highway 1 through Coquitlam Town Centre, then make the final climb into the plateau. The drive usually takes about 35 to 50 minutes. When we work here, we buy from local building-supply stores like Windsor Plywood and Lee Valley. This helps keep our materials spending in the community.
We take off rotting cedar shakes, treat the surface, and put on strong cedar siding that resists warping and moisture damage. Our method uses vertical-grain heartwood, back-priming all six sides, and a drainage mat to keep walls dry. The elevation and tree canopy in Westwood Plateau keep walls damp, so we add stepped flashing and wider overhangs to manage wind-driven rain. Replacing cladding may need a City of Coquitlam Development Permit, and construction noise is allowed Monday to Friday from 7 a.m. to 8 p.m. and Saturday from 9 a.m. to 6 p.m. Cedar siding projects here usually cost between CAD 14 and CAD 30, depending on the profile and finish. We can easily reach Westwood Plateau as part of our regular work in Metro Vancouver.
Find answers to common questions about our services, process, and craftsmanship.